Menu
ev groups

Specifications

Project Type
Apartments

Project Status
Ready to occupy with OC / NO GST
Location
Plot No. 118 Sector - 9, Ulwe, Navi Mumbai
Last Few Flats Available

LIVING/DINING

  • FLOOR : 2'x 2'Vitrified Tiles.
  • WALLS : Oil Bound Distemper Paint.
  • CEILING : Oil Bound Distemper Paint.

BED ROOMS

  • FLOOR : 2'x 2'Vitrified Tiles.
  • WALLS : Oil Bound Distemper Paint.
  • CEILING : Oil Bound Distemper Paint.

KITCHEN

  • FLOOR : 2'x 2'Vitrified Tiles.
  • PLATFORM : Granite Kitchen Platform with S. S. Sink & Full height Colour Glazed Tiles above platform

TOILETS

  • FLOOR : Anti skid ceramic Tiles.
  • WALLS : Full Height Ceramic Tiles.
  • FIXTURES/FITTINGS : Concealed plumbing Conventional CP fittings.

DOORS

  • TOILETS : Marble Frames with Water Proof Doors.
  • MAIN DOOR : Designer Wooden Flush Doors at the Entrance and other Doors.
  • WINDOWS : Heavy Section Powder Coated Aluminium Sliding Windowswith Marble Sills.
  • ELECTRICAL : Concealed Copper Wiring with adequate Electric Points Extensive Electric Layout Possible, Telephone Points, TV Points & AC Points.
  • EXTERIORS : High Quality Gujarat Sand for external plaster Curtain glazing on staircase, Texture Finishing at designated walls.
Copyright © 2020 evgroup.in. All Rights Reserved.
Name :
e-Mail :
Mob :
Sub :
Message :
Close